Underground Water Tank Waterproofing System

An underground concrete water tank needs protection at several points: beneath the raft, within the concrete, at construction joints, and across its internal and external surfaces. Ressichem’s system brings these treatments together during construction, followed by a flood test before backfilling.

  • Step 1: Protect the lean concrete with Water Guard 491.
  • Step 2: Add Max Flo Integra 3 (Powder) to the raft and retaining wall concrete.
  • Step 3: Install Ressi Swell Bar Pro 60 at the specified construction joint.
  • Step 4: Repair concrete defects with Patch 365 Plus.
  • Step 5: Apply Water Guard Crysta Coat 101 to the internal and external concrete surfaces.
  • Step 6: Form internal and external chamfers with Patch 365 Plus.
  • Step 7: Plaster the internal and external surfaces using Ressi SBR 5850 and Silmix in the mortar.
  • Step 8: Apply Water Guard 491 to the internal and external plastered surfaces.
  • Step 9: Flood test the completed tank.
  • Step 10: Inspect the waterproofing system and backfill.

Detailed description

Underground water tank waterproofing should be planned as part of the tank’s construction. Water can enter from the surrounding ground through defects in concrete, joints, and penetrations. Stored water can also escape through weaknesses in the tank. Treating the concrete, joints, and finished surfaces as one system helps address these different leakage paths.

Illustration of waterproofing process with gravel and trees

The sequence below is intended for a new underground concrete water tank. Keep the excavation suitably dewatered during construction, plan inlet and outlet pipe sleeves before casting, and allow each material to be prepared, applied, and cured according to its current technical datasheet. An existing tank with an active leak requires a separate assessment and repair approach.

Illustration of waterproofing process with concrete and trees

Step 1: Protect the lean concrete with Water Guard 491.

After excavation and stone soling, lay and cure the lean concrete beneath the tank raft. Prepare the surface and apply two coats of Water Guard 491 in perpendicular directions, following the product datasheet for surface moisture, application, and curing.

4

Once the coating is ready, place the specified protective layer of lean concrete over it before installing the raft reinforcement. Provide for inlet and outlet pipe sleeves before concrete casting so the finished tank does not need to be broken open to add them later.

71

Step 2: Add Max Flo Integra 3 to the raft and retaining wall concrete

Include Max Flo Integra 3 (Powder) in the concrete mix for the raft and retaining walls. This integral waterproofing admixture is intended to reduce concrete permeability. The mix design should establish the dosage and confirm the required concrete strength, workability, and performance under site conditions.

6

Where the construction design permits, coordinate the raft and wall pours to limit unnecessary construction joints. Any joints that remain must be treated as part of the waterproofing system.

7

Step 3: Treat construction joints with Ressi Swell Bar Pro 60

Where the retaining walls are cast in stages, install Ressi Swell Bar Pro 60 at the designated construction joint before the next concrete pour. The swellable bar is used to help seal this potential leakage path when it comes into contact with water.

Joint location, surface preparation, fixing, and concrete placement should follow the approved construction detail and the product’s installation instructions. Continue using the specified concrete mix, including Max Flo Integra 3, for the remaining pour.

81

Step 4: Repair concrete defects with Patch 365 Plus

After removing the formwork, inspect the tank raft and retaining walls on both sides. Repair honeycombing, small voids, and other suitable surface defects with Patch 365 Plus before applying the next waterproofing treatment.

Remove loose material and prepare each repair area as directed in the product datasheet. Any structural cracking, movement, or active leakage should be assessed separately before coating proceeds.

8 1

Step 5: Apply Water Guard Crysta Coat 101 to the concrete

Apply Water Guard Crysta Coat 101 to the prepared internal and external concrete surfaces of the tank. The system PDF specifies at least two coats, applied in perpendicular directions to achieve coverage across the treated surfaces.

10

The concrete must be sound and suitably prepared. Follow the current datasheet for surface wetting, mixing, application, and curing. Treat construction joints and moving cracks with their specified details; the crystalline coating does not replace those treatments.

9

Step 6: Form internal and external chamfers with Patch 365 Plus

Use Patch 365 Plus to form chamfers where the tank raft meets the retaining walls, on both the internal and external sides shown in the approved detail. Prepare these junctions carefully so the following plaster and coating treatments can continue across them.

Confirm the chamfer dimensions and application method against the project specification and the product datasheet.

11

Step 7: Plaster the internal and external tank surfaces

Once the repairs and chamfers are ready, plaster the specified internal and external concrete surfaces. The system PDF calls for Ressi SBR 5850 and Silmix to be incorporated into the plaster mortar.

Finish the plaster with a suitable texture to provide a key for the subsequent Water Guard 491 coating. Confirm the mortar mix, additive dosages, curing, and suitability for the tank’s intended water use before application.

12

Step 8: Coat the plastered surfaces with Water Guard 491

Apply Water Guard 491 to the prepared plastered surfaces inside and outside the underground tank. The system PDF specifies at least two coats in perpendicular directions so the second coat covers the application direction of the first.

4

Prepare, mix, apply, and cure the coating according to the current Water Guard 491 datasheet. Check for complete coverage at wall-to-raft junctions, corners, and other detailed areas before testing.

13

Step 9: Flood test the underground water tank

After the internal coating has cured sufficiently for testing, fill the tank with water and carry out a flood test under the project’s approved procedure. Inspect the tank and accessible external areas for signs of leakage.

If a defect is found, identify and repair its cause, allow the repair to cure, and repeat the relevant test before accepting the tank.

14

Step 10: Complete the final inspection and backfill

Before backfilling, inspect the accessible external waterproofing, joints, chamfers, and treated surfaces for damage or missed areas. Confirm that any defects found during the flood test have been resolved and that the tank has passed its required inspection.

Protect the completed external treatment during backfilling and follow the project specification for placing material against the tank walls.

15
16
17

What is a Chamfer?

A chamfer is a shaped transition at the meeting point of two surfaces, such as the junction between a tank wall and its raft. In this system, chamfers are formed at specified internal and external junctions before plastering and coating. They help the subsequent treatments continue across the change in surface direction. The approved construction detail determines their shape and size.

6.8
View PDFView Application PDF

Application Animation

Application Animation — Foundation Waterproofing Summary of application

Explainer Video

Explainer Video — Foundation Waterproofing Summary of application

Concept Video